Mammoet to Provide Heavy Lift  Transport for Saudi Aramco Project

Mammoet to Provide Heavy Lift Transport for Saudi Aramco Project

Heaviest components to be transported weigh over 400 tonnes

Samsung Engineering has awarded heavy lifting and transport scope for Aramco's Hawiyah Unayzah Gas Reservoir Storage (HUGRS) project to Mammoet in Saudi Arabia.

The project is located 260km east of Saudi Arabia's capital Riyadh. The plant comprises a gas injection facility with a capacity of 1,500 million standard cubic feet per day (mmscfd) as well as a withdrawal facility which is capable of processing up to 2,000 mmscfd of gas.

The project includes construction of a gas injection facility with booster and injection compressors, a gas reproduction facility with reproduction compressors and slug catchers, as well as various utilities & offsite facilities.

South Korean Oil & Gas Company - Samsung Engineering - the appointed main engineering, procurement and construction (EPC) contractor, has awarded Mammoet’s Saudi branch the transport and installation scope of the project.

Over 60 components will be received either at King Fahad Industrial Port in Jubail or at a fabrication facility in Dammam and transported to the site for further installation. The heaviest components include four slug catchers, each weighing over 400 tonnes.

Mammoet Wins Heavy Lift Contract for Saudi Chemical Plant

The scope includes associated port handling and customs clearance activities, obtaining of required permits from the Royal Commission and the Ministry of Transport, along with a close collaboration with Saudi Traffic Police to smoothly facilitate the project’s transport phase.

Over 200 lifts are expected to take place throughout the 17-month long project.

Kevin O’Sullivan, General Manager Mammoet Saudi Arabia commented: “This contract award follows on from the successful delivery of other projects for Samsung Engineering in Saudi Arabia, such as the Shaybah petrochemical plant construction project and Jubail United Petrochemical Company’s EO/EG plant.

“Having been present in Saudi Arabia for over 45 years, we have a proven track record of executing projects of such scale in the Kingdom.

"Our local operation hub with extensive local fleet and a dedicated local workforce in line with our commitment to Aramco’s In-Kingdom Total Value Add program (IKTVA) demonstrates this.”

The facility is expected to be completed in 2023 and will enable Saudi Aramco to efficiently manage surplus gas volumes to meet seasonal demand.

Read More: Abu Dhabi Ports' OFCO Partners with Mammoet for Turnkey Logistics

Related Stories

No stories found.
logo
Transport and Logistics ME
www.transportandlogisticsme.com